Press "Enter" to skip to content

PS 384

One school, two buildings — PS 384 outgrew its first home before it turned five, with a second campus now under construction at Parcel C.

PS 384 opened in 2019 in a temporary Court Square classroom, built to catch the overflow from an already-crowded PS 78. Seven years later, the school has outgrown its own permanent building: a second site is now under construction less than half a mile away, at Parcel C on 54th Avenue.

Every NYC public school has two identifiers that often get confused: a school number (like PS 384) and a building number, assigned by the School Construction Authority to the physical structure itself. A school can occupy one building or several, and a building can house more than one school over time. PS 384’s original site is building Q375. Its new site under construction at Parcel C is building Q341 — two buildings, one school.

OperatorNYC Department of Education
Address1-35 57th Avenue, Long Island City
(PLUTO lists official address as “2 Street” — corner-lot discrepancy)
Program4 stories, ~75,000 sq ft, ~495–497 students (PK–5)
Site size~1 acre (43,363 sq ft lot)
StatusOperational
Opened2019, incubated in a temporary Court Square space
Address1-55 54th Avenue, Long Island City (BBL 4000060160)
Program547 seats, elementary school
Site size0.78 acres (33,934 sq ft lot)
StatusUnder construction
Estimated openingSeptember 2027
(per May 2025 reporting notes)

PS 384 — Two Buildings

NYC Department of Education / SCA — Long Island City

Current Site
Q375
Parcel C Expansion
Q341
Boundary data: NYC MapPLUTO. PLUTO lists the current site’s official address as “2 Street” — a corner-lot discrepancy from the 57th Avenue address commonly used to describe the school.

PS 384, Hunters Point Elementary School, has operated out of building Q375 since 2019, a four-story, roughly 75,000-square-foot structure owned by the NYC Department of Education. The school serves close to 500 students from pre-kindergarten through fifth grade. Its founding was itself a response to overcrowding: PS 384 opened that same year in a temporary Court Square space, built to absorb kindergarten overflow from a strained PS 78.

PS 384 is expanding into a second building, Q341, now under construction at Parcel C on 54th Avenue. Designed by Purcell Everett Architects and built under a $74.7 million contract awarded to Navillus Tile, the building broke ground in November 2024 and is expected to open for the 2027-2028 school year. Reported seat counts for the building have ranged from 547 to 572 across different points in its planning process — a span likely reflecting design changes over time rather than a single fixed number.

Current Building: Q375

FXCollaborative

Expansion Building: 341Q

Purcell Everett Architects



Recently From the Ledger


Upcoming Events

No upcoming events

Mission News Theme by Compete Themes.